The upper slab of the bridge was cut, and the concretebeams were separated in order to download andpreserve them, using 7 floor saws and 9 wire sawmachines. 4500 linear meters and 500 square meterswere cut in a period of 45 days.
Email: m.Esmaeil@raslan-eg.com
Phone: 01005619136 Phone: 01005619136